1·As of the costs caused by earthquake or flood during construction, four kinds of losses are considered, they are: economic losses, casualties, construction delay and environmental impact.
针对施工期地震或洪水发生时可能造成的损失,本文从经济损失、人员伤亡、工期延误、环境影响四个方面进行了考虑。
2·Such renegotiation could jeopardize federal funding and delay construction, but the needless haste created by Washington's arbitrary deadlines have resulted in mistakes that could be extremely costly.
这样的谈判或许会让联邦基金更加捉襟见肘,也可能会延迟建设,但是华盛顿恣意定下的死线造成了没有必要的犹豫,而这种犹豫所导致的错误或许更加昂贵。
3·The state safety standards on construction projects which can not ensure the safety of buildings shall be amended without delay.
有关建筑工程安全的国家标准不能适应确保建筑安全的要求时,应当及时修订。
4·Delay of commencement or completion for matching with other important national or local construction projects.
因配合国家或地方其他重大建设需要,致须延后开工或延长完工时程者。
5·Delay is an important problem for the construction project management.
工期延误是建设项目管理中的重要问题。
6·When State standards for construction safety fail to meet the requirements for ensuring such safety, they shall be revised without delay.
有关建筑工程安全的国家标准不能适应确保建筑安全的要求时,应当及时修订。
7·Project delay is a common problem in the world construction industry today. For the construction of engineering project in our country, this problem is especially outstanding.
工期延误问题是当今世界建筑业中普遍存在的问题,对于国内工程项目建设而言,这个问题尤为突出。
8·In project construction contracts, there aren't clear agreements on the composition and calculation of Liquidated Damages for Delay at present, which have brought many difficulties.
目前工程施工合同对误期损害赔偿的构成和计算的约定不够明确,给工程实施带来了很多困难。
9·During the long period, It is believed that the mainly reason is the engineering change which results in schedule delay and cost overruns of the construction project.
在这个较长的建设周期内,工程变更被认为是导致项目工期延迟和费用超支的主要原因,在工程建设项目管理过程中倍受重视。
10·A. m evaluates delay influence on construction time by analyzing the difference between the network before delay occurrence and the network after delay occurrence.
该方法通过对某一施工延误发生前后网络状态差异的分析,来评定该延误对总工期的影响。