composite pile 双语例句
全部
1·Fomating pile mechanism and construction method of composite pile a re explored in the paper.
探讨了复合材料桩的成桩机理和施工方法。
2·Based on project, application of composite pile with caliber bore-hole in landslide emergency rescue is introduced.
结合工程实例,对小口径钻孔组合桩在滑坡体应急抢险的应用进行了初步介绍。
3·At present, the existent design theories of composite pile foundation didn't forma valid method to confirm the number of piles still.
目前已有的复合桩基设计理论中,对桩数的确定尚未形成一种统一有效的方法,有的设计人员在设计时仍按承载力控制来确定。
4·Stiffening core soil-cement composite pile is a new type of composite pile that applies in foundation treatment and foundation pit bracing.
劲芯水泥土复合桩是一种新型的地基处理和基坑支护复合桩。
5·Analysis results reflect the practical work properties of pile-soil interaction, and validate the correctness of composite pile foundation.
分析结果基本反映了桩-土-筏的实际工作性状,验证了复合桩基理论的正确性。
6·Composite pile foundation with long and short piles is a new kind of pile foundation. It is necessary to study the bearing mechanics and working behavior.
长短桩组合桩基础作为一种新型的桩基形式,对其承载性状、工作机理的研究很有必要。
7·The different distribution of pile reaction between pile groups composite foundation and composite pile foundation are studied, and some reasons are given.
研究了多桩复合地基与多桩复合桩基在桩顶反力分布上的不同,分析了出现差别的原因。
8·The reinforced mixing pile is a new kind of composite pile used in soft ground engineering which is composed of cement-soil ring and reinforced concrete core.
劲性搅拌桩是适用于软土地基的一种新型复合桩,桩体由水泥土环桩内包钢筋混凝土芯桩组成。
9·The paper briefly introduces the construction process, quality control and settlement detection technique of settlement control composite pile at F1 autodrome.
文章简单介绍F1赛车场沉降控制复合桩的施工工艺、质量控制、沉降观测技术措施。
10·Jet grouting (JG) soil-cement-pile strengthened pile (JPP) is a new kind of composite pile composed of high-pressure jet grouting pile and prestressed core pile.
高喷插芯组合桩(JPP)是由高压旋喷桩和预应力混凝土芯桩构成的一种新型组合桩。
